Web app and SaaS development from 10 days
We build web apps to order, turnkey: SaaS, startup MVPs, user accounts with roles, a database and API, dashboards. Price from $8,145 (≈ AED 29,900), timeline from 10 days; both are fixed in the contract before work starts.
What's included in a web app from $8,145
The Web app / SaaS tariff starts from $8,145 (≈ AED 29,900) and from 10 days. The base scope is a working project on your domain: user accounts and roles, a database and API, dashboards, payment processing, 1–2 external integrations and deployment.
One interface. A connected system.
Portals and roles define access, the API connects actions to business logic, and the database stores the result. Each layer has a clear purpose.
User accounts and roles
Who sees and can change what is set by roles.
Database and API
A database schema and a REST/JSON API tailored to your entities.
Dashboards and tables
Filtering, search and export.
Sign-in and notifications
Sign-up, sign-in, password recovery and email notifications.
Payment processing
Telr, Network International, PayTabs or Stripe, plus transaction tracking.
1–2 external integrations
A CRM, a messenger or a third-party API service. A third and further ones are quoted separately.
Responsive layout
The app works on desktop and on mobile.
Server deployment
Deployment, domain, SSL and basic analytics.
Which web apps we build on this tariff
One tariff, different products: from an MVP to test a hypothesis to an app with roles and payments. We refine the scope and the final price after the brief.
Startup MVP
One or two core flows, sign-up, roles and a database — what you can show to investors and the first users. Timeline on the tariff: from 10 days.
SaaS product
Accounts with roles, payment processing and transaction tracking. Non-standard payment schemes are quoted after the brief.
User account or internal service
A closed area for clients, partners or staff, on the same tariff.
Record-keeping system or CRM
A custom system for a non-standard process: statuses, roles, reports.
How web app development goes
Four stages from the brief to handover of access. The price and timeline are fixed in the contract before work starts, not along the way.
Brief and specification
We go through roles, flows, the data model and integrations. The price and timeline go into the contract before work starts.
Prototype and data schema
Screens and the database schema are agreed before the build. Up to 2 rounds of revisions on the prototype.
MVP build
User accounts, API, dashboards and payments — following the approved prototype.
Testing, launch, acceptance
Checks on demo data, deployment to a server, 5 business days for acceptance, then handover of access. Up to 2 rounds of revisions on the finished build.
How much a web app costs and what the price depends on
What "from $8,145" means. This is the base price of the tariff: user accounts and roles, a database and API, dashboards, payments and 1–2 external integrations. We calculate the total for your product after the brief and write it into the specification to the contract. After that the price is fixed in the contract and changes only by agreement of the parties if the scope changes.
What "from 10 days" means. This is the timeline on the price list for a compact first version. The exact timeline depends on the number of roles, flows and integrations; the contract states it in business days. The routine part of the work — screens, CRUD, API — we build on our own pipeline with ready-made blocks, while our developers design and review the data schema, roles and access.
MVP or a full SaaS. It makes sense to start with an MVP: one or two core flows to test the hypothesis and show the product. After that the product grows in iterations, and new modules are quoted separately.
When another tariff is needed. Native iOS and Android apps are a separate tariff, from $9,505. If you need a website with a request form rather than a product with accounts, see landing pages or corporate sites.
What is not included in the base price
So that the estimate does not grow unexpectedly, we list up front what is charged separately.
- Native mobile apps for iOS and Android — a separate tariff
- Integrations beyond two; non-standard payment schemes are quoted after the brief
- Marketing copywriting, photo and video content
- Legal documents (offer agreement, privacy policy) and merchant acquiring under your legal entity
- Support after the first 14 days — on a retainer or hourly
Revisions, support and what you get
Revisions. Up to 2 rounds on the prototype and up to 2 on the finished build; minor cosmetic tweaks are not counted as a round within each stage. Work beyond the agreed specification is documented separately.
Support. 14 days of free support after launch — we fix bugs. After that, on a retainer or hourly. The contract warranty is separate: we fix errors that are our fault free of charge for 30 calendar days from the date of the acceptance certificate.
You get. A deployed, working project under your domain, the frontend and backend source code in your Git repository, access to the server, database, domain and payment account, and a concise guide to launching, deploying and administering the project. The exclusive right to the code stays with the studio; after full payment you get a license for the whole term of the exclusive right: any server, any contractors. The logo, texts and brand identity created for you are yours.
What is fixed in the contract
The terms follow the studio's standard contract and the web app tariff. The full text (in Russian) and the appendices are on the Contracts page; the tariff scope is on the price list.
| Term | How it is written |
|---|---|
| Price | From $8,145 (≈ AED 29,900) on the tariff; the total is stated in the contract and the specification. Fixed in the contract: it changes only by a supplementary agreement if the scope changes. |
| Timeline | From 10 days on the tariff. In the contract — in business days, counted from receipt of the prepayment and handover of materials. |
| Payment | 50% prepayment within 3 business days after signing the contract and 50% within 3 business days after signing the acceptance certificate. The contractor is exempt from VAT under Art. 145(1) of the Tax Code of the Russian Federation; if the exemption is lost, VAT is added on top of the price (clause 2.1). |
| Revisions | Up to 2 rounds on the prototype and up to 2 on the finished build — tariff terms. Under the contract, revisions are made within the agreed specification. |
| Acceptance | 5 business days to sign the certificate or send a reasoned refusal with a list of remarks. |
| Warranty | 30 calendar days from the date of the certificate: we fix errors that are our fault free of charge. Changes made by you or third parties and failures of third-party services are not covered. |
| Support | 14 days of free support after launch on the tariff, then on a retainer or hourly. Separate from the warranty. |
| Rights to the code | The exclusive right belongs to the studio; after full payment you get a license for the whole term of the right, with the source code in your repository (section 5). |
The contract is signed before work starts; the specification and the appendix to it record the scope and the price of your particular project.
Questions about web app and SaaS development
How much does web app development cost?
From $8,145 (≈ AED 29,900) on the Web app / SaaS tariff: user accounts and roles, a database and API, dashboards with export, payment processing, 1–2 external integrations and deployment. We calculate the final estimate after the brief and fix it in the contract before work starts.
How long does it take to build a web app or MVP?
From 10 days — that is the timeline on the price list for a compact first version. The exact timeline depends on the number of roles, flows and integrations; the contract states it in business days, counted from receipt of the prepayment and handover of materials.
What is included in turnkey web app development and what is not?
Included: user accounts and roles, a database and API, dashboards, payment processing, 1–2 external integrations, responsive layout and deployment to a server. Not included: native iOS and Android apps, integrations beyond two, non-standard payment schemes, copywriting, photo and video, legal documents and merchant acquiring under your legal entity.
How is an MVP different from a full SaaS?
An MVP is a first version with one or two core flows, built to test a hypothesis and show the product to investors. A SaaS is a product for many customers that grows in iterations. You can start with an MVP from $8,145; non-standard payment schemes are quoted after the brief.
Can you connect payments and external services?
Payment processing (Telr, Network International, PayTabs or Stripe) with transaction tracking and 1–2 external integrations — for example a CRM, a messenger or a third-party API service — are included in the tariff. A third and further integrations and non-standard payment schemes are quoted after the brief.
Who owns the code of the web app?
We hand over the frontend and backend source code to your Git repository, along with access to the server, database, domain and payment account. The exclusive right to the code stays with the studio; once you have paid in full you get a license for the whole term of the exclusive right, so you can host it on any server and develop it with any contractor. The logo, texts and brand identity created for you are yours.
Let's discuss your product and estimate the cost
Tell us about your idea — we'll come back with a price, timeline and MVP plan. The price and timeline are fixed in the contract before work starts.

