A turnkey online store from 5 days — with payments, delivery and one CRM/ERP link
We build a turnkey online store: a catalog with filters and search, cart and checkout, online payment, delivery, customer accounts, an admin panel and one CRM, inventory or ERP integration. Layouts for the catalog, product page, cart and checkout are made for your assortment. Price from $4,060 (≈ AED 14,900), timeline from 5 days; both are fixed in the contract before work starts.
How much does a turnkey online store cost
A turnkey online store costs from $4,060 (≈ AED 14,900) and takes from 5 days. The price includes a catalog with categories, filters and search, a cart and checkout in 1–2 steps, online payment through a payment gateway, delivery calculation and selection, customer accounts, an admin panel for products, prices, stock and orders, responsive layout and one CRM, inventory or ERP integration via API.
What is priced separately. Catalog population beyond demo examples, product photography, acquiring fees, delivery-service rates, paid third-party licenses, hosting and custom integrations beyond the first one. Marketplace sync (Amazon.ae, Noon, Talabat) is a separate plan, “Marketplace automation”, from $2,150 (AED 7,900) — see pricing.
Payment. 50% upfront, 50% on acceptance. All plans are on the pricing page; contract terms are in the standard contracts (in Russian).
What a turnkey online store includes
The scope follows the “Online store” plan on the pricing page; the exact list goes into the specification to the contract.
Catalog and product cards
Categories, filters, search and product pages, responsive layout for phone, tablet and desktop. Catalog population beyond demo examples is extra.
Cart and checkout
Cart and checkout in 1–2 steps. Layouts for the catalog, product page, cart and checkout are agreed on the design prototype.
Online payment
We connect a payment gateway (Telr, Network International, PayTabs or equivalent). Acquiring fees are not included.
Delivery
Delivery cost calculation and selection, integration with a delivery service. We record which service is connected in the specification; delivery-service rates are not included.
Customer accounts and admin panel
Customer accounts and access roles (customer, manager, admin). Admin panel: products, prices, stock, orders and statuses.
One CRM, inventory or ERP link
One integration via API is included in the price. Each further integration is quoted after the brief.
How we build an online store: 4 steps
The timeline is counted in working days from the prepayment and handover of materials.
Brief and structure
We go through the assortment, product categories, payment and delivery scenarios and the systems to connect. We name the price and timeline and put them in the contract.
Design prototype
We show layouts of the catalog, product page, cart and checkout. Up to 2 rounds of revisions on the prototype.
Build and connect
We build the storefront and catalog and connect payment, delivery, the admin panel and the CRM, inventory or ERP link. Up to 2 rounds of revisions on the finished build.
Tests, launch and acceptance
We test orders, load demo data, launch on your domain and hand over access. Acceptance takes 5 working days; after the acceptance certificate there is a 30-calendar-day warranty.
Not included in the base price
So the quote does not grow unexpectedly, we list what is priced separately.
- Catalog population with products and content beyond demo examples
- Professional product photography and retouching
- Acquiring fees, delivery-service rates, paid third-party licenses and hosting
- Custom integrations and any CRM, inventory or ERP link beyond the first one
- Marketplace sync (Amazon.ae, Noon, Talabat) — a separate plan, “Marketplace automation”, from $2,150 (AED 7,900), see pricing
- Mobile apps for iOS and Android — a separate plan, see pricing
What the contract fixes
Terms of the standard contract and of the “Online store” plan.
| Term | How it is recorded |
|---|---|
| Price | Fixed in the contract: a store starts from $4,060 (≈ AED 14,900); we name the final amount after the brief. It changes only by an addendum that changes the scope. |
| Timeline | From 5 days. The contract states the timeline in working days, counted from the prepayment and handover of source materials. |
| Payment | 50% within 3 working days after the contract is signed, 50% within 3 working days after the acceptance certificate is signed. |
| Acceptance | 5 working days to sign the acceptance certificate or send a reasoned refusal listing the remarks. |
| Late delivery | The party at fault pays a penalty of 0.1% of the work cost per day of delay, capped at 10% of the contract amount. |
| Revisions | Per the store plan: up to 2 rounds on the prototype and up to 2 on the finished build. Work beyond the agreed specification is formalised separately. |
| Warranty | 30 calendar days from the acceptance certificate: defects caused by us are fixed free of charge. Changes made by you or third parties and failures of third-party services are not covered. |
| Support | Per the store plan: 14 days free after launch, then a support subscription. This is separate from the warranty. |
| Code and rights | The exclusive right to the code stays with the studio; after full payment you receive a licence for the whole term of the right. Source code is handed over with the result — to your repository or as an archive. The logo, texts and identity created for you are yours. |
Full text: standard contracts (in Russian), with the specification and the acceptance certificate. The “Revisions” and “Support” rows are plan terms — see pricing.
Revisions, support and what you get
Revisions. Up to 2 rounds on the prototype (layouts of the catalog, product page, cart and checkout) and up to 2 on the finished build. Work beyond the agreed specification, for example a change of concept or new sections, is quoted separately.
Support. 14 days of free support after launch: we fix bugs and make minor tweaks; after that, a support subscription. The warranty under the contract is separate: defects caused by us are fixed free for 30 calendar days after the acceptance certificate.
You get. The source code, access and a brief guide to running the store. Rights to the code are in the “Code and rights” row of the contract table.
Common questions about online stores
How much does a turnkey online store cost?
From $4,060 (≈ AED 14,900) for the Online store plan: catalog, cart, online payment, delivery, customer accounts, an admin panel and one CRM, inventory or ERP integration. Catalog population beyond demo examples, photography, acquiring fees and delivery rates are extra. We name the exact price after a brief and fix it in the contract before work starts.
How many days does it take to build an online store?
From 5 days. In the contract the timeline is in working days and counts from the prepayment and handover of materials; we name the exact timeline for your assortment and integrations after the brief.
What payment and delivery options can be connected?
Connecting a payment gateway (Telr, Network International, PayTabs or equivalent) and integrating a delivery service are part of the plan. We record the list of payment methods and services in the specification; acquiring fees and delivery rates are not included.
Will you integrate the store with our ERP or CRM?
Yes: one CRM, inventory or ERP integration via API is included in the price. A second and further integrations, changes inside the ERP itself and custom exchange logic are quoted separately.
Will you export products to Amazon.ae and Noon?
That is a separate plan, “Marketplace automation”, from $2,150 (≈ AED 7,900), from 3 days: connecting seller accounts via API, bulk upload and update of product listings, and sync of stock and prices with your warehouse or ERP. It is not included in the store price.
Who owns the online store after delivery?
The source code is handed over with the result — to your repository or as an archive. The exclusive right to the code stays with the studio; after full payment you receive a licence for the whole term of the right, so the store can run on any server and be extended by any contractor. The logo, texts and identity created for you are yours.
Let's price your online store
Leave a request — we'll come back with the scope, an exact price and a timeline for your assortment and integrations.
