Order a landing page in 2 days
A turnkey landing page is a one-pager for your ad traffic: an offer and screen structure, custom design, a lead form to Telegram or email and analytics from the first click. Copy comes from your materials; copywriting is extra. Price from $1,335 (AED 4,900), term — 2 days; price and deadline are fixed in the contract before work starts.
How much a turnkey landing page costs and what is included
A turnkey landing page starts from $1,335 (AED 4,900) and takes 2 days. The price includes custom design of one page, responsive layout, a lead form to Telegram or email, analytics setup, basic SEO and launch on your domain. Copywriting, shooting, domain and hosting, CRM and ERP integrations are extra.
Offer and screen structure
Brief: page goal, offer, block structure. We map the path to a lead: hero offer, benefits, cases or testimonials, call to action.
Design and responsive
Custom design of one page for your brand, not a template. Works correctly on phone, tablet and desktop.
Lead form
Requests go to Telegram and/or email. Messenger and call buttons, links to social media.
Analytics
We connect Google Analytics, so you can see where visitors and leads come from.
Basic SEO
Title, description, Open Graph and favicon — within the price.
Launch and handover
We publish on your domain, set up SSL (https) and hand over the page source files and access.
What is not included in the base price
So the estimate does not grow after the start, we list in advance what is billed separately.
- Copywriting: we take the texts from your materials, writing them is available at extra cost
- Photo and video shooting, purchase of photos
- Domain and hosting — paid directly to your registrar and hosting provider
- A multi-page website, catalog, user account and online payments — these are other plans: corporate site, online store, web app
- CRM/ERP integrations, chatbots, complex automation — quoted after the brief
- Support after the first 7 days — on a retainer or hourly basis
- A change of concept after the mockup is approved
What is fixed in the contract
Price, term, payment, acceptance, revisions, warranty and support are written into the contract before work starts.
| Term | How it is written |
|---|---|
| Price | Fixed in the contract in roubles: from 24,000 ₽ (≈ $1,335 / AED 4,900) for a landing page; we name the exact amount after the brief. The scope changes only by agreement of the parties, in a separate document. |
| Term | 2 days. The contract states the term in business days, counted from receipt of the prepayment and your materials. |
| Payment | 50% prepayment and 50% after the acceptance act, each within 3 business days. |
| Acceptance | 5 business days to accept the work under the acceptance act. |
| If the deadline is missed | The party at fault pays a penalty of 0.1% of the cost of work for each day of delay, capped at 10% of the contract amount. |
| Revisions | Up to 2 rounds: on the mockup and after the build, within the agreed structure. A change of concept after approval is billed separately. |
| Warranty | 30 calendar days from the acceptance act: errors on our side are fixed free of charge. |
| Support | 7 days free after launch: bug fixes and minor tweaks, separate from the warranty. After that — on a retainer or per task. |
Plans and scope — on the pricing page. Contracts are in Russian and priced in roubles; the USD/AED figures are for reference. Standard contracts: documents section.
What you get
A published landing page on your domain (https), page source files and access to the repository, access to analytics and connected forms, and a short guide on how to edit the text and where form submissions arrive. The exclusive right to the result of the work (code and mockups) stays with the studio; after full payment you receive a simple (non-exclusive) license for the whole term of the exclusive right: the landing page can be hosted on any server and developed further by any contractor. The logo, texts and brand-style elements, if they are created for you under the contract, pass to you after full payment.
How we build a landing page
We assemble design and layout on our own pipeline of ready-made blocks, and a human checks the offer and the visitor's path to the lead form.
Offer and message first
We start with the offer, not the design: what you offer, to whom and why you can be trusted. We agree the screen structure before the design.
Our own pipeline
Design and code are assembled on our own pipeline of ready-made blocks. Price and term are fixed in the contract before work starts.
Human review
A human reviews every screen: offer logic, calls to action and the path to the lead form.
Leads and analytics
The form sends leads to Telegram or email, and connected analytics shows where visitors come from. Passing leads to a CRM is extra.
From brief to launch in 4 steps
A landing page takes 2 days. The contract states the term in business days, counted from receipt of the prepayment and your materials.
Brief and contract
We review the product, audience and traffic source, shape the offer and screen structure. We sign the contract: price and term are fixed before the start, 50% prepayment.
Design and mockup
We build a custom design from your materials and show the mockup. Up to 2 rounds of revisions: on the mockup and after the build.
Form and analytics
We code the responsive layout and connect the lead form (Telegram or email) and Google Analytics.
Launch and acceptance
We publish on your domain and hand over the source files and access. 5 business days for acceptance; 7 days of free support after launch and a 30-day warranty after the act.
Questions about ordering a turnkey landing page
How much does a turnkey landing page cost?
From $1,335 (AED 4,900) for a one-page landing page: custom design, responsive layout, a lead form to Telegram or email, analytics, basic SEO and launch on your domain. We give the exact price after a short brief — we usually reply within an hour in business hours — and fix it in the contract before work starts.
How many days does a landing page take?
Two days. The contract states the term in business days, counted from receipt of the prepayment and your materials: logo, photos, texts, access. For a missed deadline the party at fault pays a penalty of 0.1% of the cost of work per day, capped at 10% of the contract amount.
What is not included in the landing page price?
Copywriting, photo and video shooting, domain and hosting, a multi-page site, a catalog, a user account and online payments, CRM/ERP integrations and chatbots. We take the texts from your materials; writing them is available at extra cost.
Where do landing page leads go?
To Telegram and/or email, as you choose. Passing leads to a CRM is an extra service that we quote after the brief. Google Analytics is connected within the price.
Is it a template or a custom design?
A custom design of one page for your offer, not a template. We agree the mockup with you; up to 2 rounds of revisions: on the mockup and after the build. A change of concept after approval is billed separately.
Order a turnkey landing page in 2 days
Leave a request — we'll quote your task and discuss the structure of your future landing page. No obligations.
