We use cookies — for sign-in and anonymous statistics. Details
Portfolio

Our work

Websites, platforms and apps we've built. Explore the projects, interfaces and development work.

Application builder home page · live public website, November 2026roboweb.dev↗
Website and public project-building demo · November 2026
AI platform · own product

Roboweb.dev

Our AI platform combines chat-based generation and editing with a code editor, data and user accounts. Projects can be published, with code exported as a ZIP archive or to GitHub.

ReactPythonAI
Purchase request and supplier offers · local demo build, November 2026snabzhenets.tech↗
Requests, supplier offers, invoices and bank reconciliation · demo data
B2B procurement platform · AI

Snabzhenets

Construction procurement platform with requests and tenders, quotation comparisons, budgets, CRM, supplier invoices and AI assistants.

ReactNestJSAI
Contract register · public product demo screenshotreestor.online↗
Website and demo contract-management screens
AI platform · documents

Reestr

Contracts, acceptance documents and payments in one register: document recognition, checks of details and relationships, and fulfilment and payment records for each contract.

ReactPostgreSQLAI
Chat with sources and legal references · archived demo screendovod.site↗
Archived demonstration project screens
AI assistant · legal work

Dovod

Answers linked to legal sources, search across case materials and document drafting. Shared team cases and private conversations with the assistant.

React 19PostgreSQLAI
Address check result · archived interface, data as capturedbanradar.tech↗
Archived address-check and event-feed screens
Blockchain · address monitoring

BanRadar

USDT/USDC blocklist monitoring, address checks, relationship analysis and reports. A web account, Telegram bot and API.

PythonFastAPIBlockchain
Home page with market quotes · archived public screen from 5 November 2026blockguard.tech↗
Archived monitor and local project website screens
Finance · rates and forecast ranges

BlockGuard

Currencies, cryptocurrencies and gold: forecast ranges, a log of forecast checks and Telegram notifications that account for the age of the data.

PythonMOEXTelegram
Project channel conversation · actual local application with test data, November 2026gonec.tech↗
Channels, threads, pins, search and notifications · local demo
Team communication · web client

Gonets

Channels, threads and history search, calls and conferences, files and work integrations. A web client for team communication.

React 19WebSocketSQLite
Maintenance contract and payments · local test build, November 2026krom-itsm.ru↗
Service catalog, calendar, contracts, jobs and report · test data
ITSM · service desk

KROM

Tickets and SLAs connect to equipment, maintenance, materials and contracts. From a request to the work, inventory movement and payment.

ReactNode.jsITIL 4
BIM model and work status · demo datastroy-oko.ru↗
Construction management screens · demonstration project
Construction control · web and PWA

StroyOko

Construction control with BIM linked to estimates, schedules and a building overview, defects, work acceptance, materials and documents.

ReactBIM / IFCPWA
Car rental home page · live public website, November 2026lencar.rentals↗
Five screens from the live website · November 2026
Rental website · cars

LENCAR

Car rental website with fleet filters, galleries, rates and rental enquiries. The owner manages vehicles, prices, copy, contacts and SEO through the admin panel.

Node.jsSQLiteSSRAdmin panel
Collection home page · live public website, November 2026aleksfurs.com↗
Five screens from the live website · November 2026
Online store · fur

AleksFurs

A fur salon’s online store with catalogue filters, typo-tolerant search, a cart and checkout. A store admin panel and an implemented 1C data exchange module.

Node.jsPostgreSQL1CSSR
Home page and car selection · live public website, November 2026serialcars.ru↗
Five screens from the live website · November 2026
Portal · car imports

SerialCars

A catalogue of cars from Korea with search, filters and an itemised import price. Listing imports, image processing and a separate request-based service for cars from China.

PythonCatalogueImage processing
Store home page · live public website, November 2026groad.site↗
Five screens from the live website · November 2026
Tyre centre · wholesale and retail

Green Road

Brand and website for a tyre centre: tyre and wheel catalogues with vehicle fitment search, product pages and price management. Lead CRM, quotation preparation and a partner portal were also developed.

Node.jsCataloguePartner portal
Manufacturer home page · local preview of current site files, November 2026bytpolimer.ru↗
Website, products, catalog and manufacturing · local project version
Manufacturer website · bags

Bytpolimer

A manufacturer’s website with product lines, an item specification table, bag designs, production photos, delivery information and directions. Product details open in catalogue dialogs.

WebsiteCatalogueHTTPS
Active meeting plan · test iOS build screen, October 2026Web · iOS→
iOS build screens: security and app access
Dating · web and iOS

Twin

Twin helps people move from a profile to a conversation and a meeting: interest-based matching, mutual likes, match explanations, chat and a meeting plan with a trusted contact.

ReactJavaScriptVite
Portal project overview · saved local demo portal screen, November 2026roboweb.team↗
Current website and demo client portal screens
Studio · client portal

Roboweb.team

Our studio’s client portal brings together a Kanban board, deadlines, acceptance, invoices, documents, releases and analytics for the team’s work.

Node.jsSQLiteClient portal
Gaming project home page · public website with demo data, November 2026bccs2.ru↗
Servers, store, ranks and battle pass · demonstration data
Gaming portal · CS2

Black Cat

A gaming portal with a shop, account area, ranks and clans. Steam sign-in and server modules are implemented; the public demo uses test payments and simulated online counters.

Node.jsSteamDemo
Unit-1 website home screen · archived website versionHistorical project→
Archived project screen
Landing page · construction

Unit-1

A construction company’s landing page with an opening screen, services and projects, and routes to an enquiry. The version shown is the one delivered at project handover.

Landing pageConstruction
Level start · iOS build screen, October 2026roboweb.team/chaspik↗
Five gameplay screens and states from the iOS build
Game · iOS and web

Rush Line

Clear buses from a crowded parking lot, board passengers by colour and keep the waiting bench from filling up. The campaign introduces obstacles; daily challenges and timed mode add new goals.

SwiftSwiftUISpriteKit
iPad game screen · iOS build screen, October 2026roboweb.team/orbita↗
iPhone and iPad gameplay screens
Game · iOS and web

Orbit

Tap to reverse the ship and swipe to change orbit. Collect cores in streaks, catch bonuses and avoid asteroids using warning arcs. The planet, effects and sound are generated in code.

SwiftSpriteKitCore Graphics
Turn-based battle and weapon selection · iOS build screen, October 2026iOS · iPhone and iPad→
Five gameplay screens from the iOS build
Game · iOS

Cataclysm

Two squads of cats fight on terrain reshaped by every explosion. Choose weapons, account for wind and use the landscape: a drill moves beneath cover, while a grappling hook helps with movement.

SwiftSwiftUISpriteKit
Kontur AI — AI workspace · private test environmentKontur AI→
Local build screenshot
AI workspace · private test environment

Kontur AI

A workspace for AI requests, projects and presets, with usage accounting and an activity ledger.

TypeScriptReactCloudflare Workers
Vne Granic — Fintech · test environmentVne Granic→
Local test environment screenshot
Fintech · test environment

Vne Granic

An international payment calculator and two dashboards for testing the request flow from quote to completion.

TypeScriptCloudflare WorkersD1
MV Service — Property management · website and portalMV Service→
Local website screenshot
Property management · website and portal

MV Service

A property management website and resident portal for requests, passes and enquiries.

HTMLCSSJavaScript
PNP — Corporate website · cataloguePNP→
Local website screenshot
Corporate website · catalogue

PNP

A multi-page PNP website with an interactive catalogue and a responsive enquiry form.

HTMLCSSJavaScript
Intercept — Game · browser shooterIntercept→
Test build screenshot
Game · browser shooter

Intercept

A tactical browser shooter with bots, round economy and procedural graphics.

JavaScriptThree.jsWebGL 2
Salto — Game · iPhone simulatorSalto→
Test build screenshot
Game · iPhone simulator

Salto

An iPhone acrobatics simulator with high bars, trampolines and replays.

SwiftSpriteKitiOS
Podyom — Studio tool · SEOPodyom→
Local website screenshot
Studio tool · SEO

Podyom

An SEO tool for position tracking, page audits, draft preparation and reporting.

PythonJavaScriptYandex API
Povod — Studio tool · sales researchPovod→
Signal matching diagram
Studio tool · sales research

Povod

A tool that gathers business signals, matches them to studio products and drafts outreach.

PythonSQLiteJavaScript
Infra Panel — Studio tool · monitoringInfra Panel→
Monitoring diagram
Studio tool · monitoring

Infra Panel

An infrastructure status dashboard with agents, external checks and notifications.

Node.jsHTTPTLS
Server Watch — Studio tool · inventoryServer Watch→
Inventory workflow diagram
Studio tool · inventory

Server Watch

Scheduled server inventory collection, snapshot comparison and a change log.

Node.jsBashSSH